Migration Planning / Deployment Playbook

Practice: policy scope, algorithm use and retention risk

Fictional customer-portal policy revision 1 requires migration by 2030 where it applies. The portal uses classical key establishment during transition. Compare the sample with an assumed eight-year horizon. Predict which outcomes concern the policy, the chosen primitive or the exposure model.

Evaluate production tools for versioned source clauses and applicability, algorithm/use-case checks, transparent assumptions, boundary tests and reproducible outputs. A real deadline must be sourced and scoped to the authority, system and use case before enforcement. Passing this fictional scenario does not verify a deployed system.

What this is for: Generate deployment playbooks with rollback procedures and validation steps.

What a good answer looks like: A colleague could run it at 3am without calling you. That is the only real test of a playbook.

Worked example: Tick 'Configure hybrid classical+PQC mode' and 'Prepare rollback automation scripts' under Pre-Deployment Preparation: the counter reads 2/38, the outlined critical items cannot be skipped, and the saved playbook keeps the checkmarks.

Runtime and privacy: This planning tool runs in your browser. Use synthetic or approved organizational data and review the site privacy terms before entering sensitive material.

Browse all Business tools · Browse PQC learning modules

For your role

Executive / Business Leader
Seven phases from Pre-Deployment Preparation to Rollback Procedures, each a checklist: the test the tool sets is that a colleague could run it at 3am without calling you.
GRC / Risk & Compliance
Tick the items as they are done, from feature flags and hybrid mode to Post-Deployment Validation and the Decommission Plan: the .pdf is the change record, with the CSWP.39 §4 methodology cited at the top.

Methodology

Related reading: NIST CSWP.39 §4 discusses system implementations; §4.6 describes an external gateway that can help provide crypto agility when legacy components cannot be changed directly. The lifecycle checklist below is a Hub planning example. Its review/exit prompt and critical-item labels are teaching choices, not a sunset rule prescribed by NIST. A gateway can change the architecture while embedded legacy cryptography remains unchanged.

Retirement entries are fictional planning examples; separate sample tests can illustrate rejection of an old path, but do not establish retirement of a deployed system. Module validation, algorithm tests and vulnerability scans answer different questions; none alone shows that an old deployment path was removed.

Decide whether to roll back the canary

Review fictional results for 20 connection probes from a gateway pilot. This sample change policy holds rollout when more than 5% of probes fail. If the gate fails, restore the approved baseline and check its health before attempting another canary.

The results come from a training fixture. For a real change, record the tested peer configuration, any security exception for the baseline, the recovery probes, and the owner’s decision.

Records archiving and retrieval service: retirement example

Compare the supplied inventory, route configuration, connection trust and batch-reader references. Removing a gateway alone can leave a direct legacy fallback.

Fictional snapshot:

Incomplete: old paths or evidence gaps remain

  • Inventory: legacy-gateway
  • Inventory: direct-legacy
  • Configured old route: legacy-gateway (enabled)
  • Configured old route: direct-legacy (enabled)
  • Trust reference: legacy-connection-trust
  • Dependency: batch-reader -> direct-legacy
  • Old path still accepts: legacy-gateway
  • Old path still accepts: direct-legacy

Authored fictional observations, not executed network or cryptographic tests. Consistency covers only the declared sample routes. Connection-trust removal does not mean deleting historical signature-verification material or protected records.

In your production tools, compare inventory and configuration, trace trust and dependencies, and target every old path plus a replacement control. Retain configuration identity, observation time, tool/version and outcome.

Inspect or copy the fictional packet

Compare scenario outputs

Keep a baseline, change one assumption in the tool, then compare the generated report here. The comparison stays in this browser tab when session storage is available.

Before cutover records

{
  "label": "Before cutover",
  "inventory": [
    "legacy-gateway",
    "direct-legacy",
    "replacement-route"
  ],
  "routes": [
    {
      "target": "legacy-gateway",
      "enabled": true
    },
    {
      "target": "direct-legacy",
      "enabled": true
    },
    {
      "target": "replacement-route",
      "enabled": true
    }
  ],
  "trustReferences": [
    "legacy-connection-trust"
  ],
  "dependencyReferences": [
    "batch-reader -> direct-legacy"
  ],
  "observations": [
    {
      "target": "legacy-gateway",
      "outcome": "accept"
    },
    {
      "target": "direct-legacy",
      "outcome": "accept"
    },
    {
      "target": "replacement-route",
      "outcome": "accept"
    }
  ]
}

Selected records and observations

{
  "label": "Before cutover",
  "inventory": [
    "legacy-gateway",
    "direct-legacy",
    "replacement-route"
  ],
  "routes": [
    {
      "target": "legacy-gateway",
      "enabled": true
    },
    {
      "target": "direct-legacy",
      "enabled": true
    },
    {
      "target": "replacement-route",
      "enabled": true
    }
  ],
  "trustReferences": [
    "legacy-connection-trust"
  ],
  "dependencyReferences": [
    "batch-reader -> direct-legacy"
  ],
  "observations": [
    {
      "target": "legacy-gateway",
      "outcome": "accept"
    },
    {
      "target": "direct-legacy",
      "outcome": "accept"
    },
    {
      "target": "replacement-route",
      "outcome": "accept"
    }
  ]
}

Inspecting this sample does not complete or save the separate planning checklist below.

PQC Deployment Playbook

Operational procedures for deploying PQC across production infrastructure — covering hybrid mode, canary testing, progressive rollout, validation, and rollback. Retirement entries are fictional planning examples; separate sample tests can illustrate rejection of an old path, but do not establish retirement of a deployed system.

0/38
Compare scenario outputs

Keep a baseline, change one assumption in the tool, then compare the generated report here. The comparison stays in this browser tab when session storage is available.

Try it

  1. 1. Predict before you run it.
  2. 2. Run or change the tool above.
  3. 3. Explain what the result shows.

What is the tool's only real test of a playbook?

Next step

Next in Migration Planning: Hybrid Transition Planner

Hybrid Transition Planner is the next Migration Planning tool in the Command Center.