Risk & Strategy / Cost Model Explorer
§5Practice: policy scope, algorithm use and retention risk
Fictional customer-portal policy revision 1 requires migration by 2030 where it applies. The portal uses classical key establishment during transition. Compare the sample with an assumed eight-year horizon. Predict which outcomes concern the policy, the chosen primitive or the exposure model.
Evaluate production tools for versioned source clauses and applicability, algorithm/use-case checks, transparent assumptions, boundary tests and reproducible outputs. A real deadline must be sourced and scoped to the authority, system and use case before enforcement. Passing this fictional scenario does not verify a deployed system.
What this is for: Compare the six PQC costing-model families on one scenario, with a live Monte Carlo run.
What a good answer looks like: A range, not a point. The honest output of this tool is the spread between your best and worst assumptions, and which assumption drives it.
Worked example: Enter the systems in scope and the annual IT budget, then compare the parametric, bottom-up and Monte Carlo estimates: the spread between them is your honest range, and the driver that moves it most is the assumption to defend.
Runtime and privacy: This planning tool runs in your browser. Use synthetic or approved organizational data and review the site privacy terms before entering sensitive material.
For your role
- Executive / Business Leader
- Enter the systems in scope and the annual IT budget, then read the parametric, bottom-up and Monte Carlo estimates side by side: the spread between them is the honest range to bring to a budget discussion.
- GRC / Risk & Compliance
- Run Monte Carlo and note which slider moves the result most: that assumption is the one to document and defend, and the cost-of-inaction line is shown as a reference because it measures a different thing.
Feel the difference. One scenario, six lenses. Five estimate the cost of migrating; the sixth (cost of inaction) is shown as a reference line, because it measures a different thing. Every figure is illustrative and driven by the sliders below — the lesson is how far the methods diverge.
8% of IT budget × 5yr — ignores system count entirely, and is the lens most sensitive to programme duration.
$40K/system × complexity × 250 + $3.3M standing program cost over 5yr.
Samples an uncertain per-system cost → P10–P90 band. A range, not a point.
Bottom-up estimate × 0.7, 1 or 1.6, using optimistic, expected and conservative assumptions respectively.
$30K/system illustrative anchor × 1.0× complexity × 250 systems + $3.3M standing program cost over 5yr.
On this scenario the five migration-cost methods range from $10.8M to $20.0M — a 1.8× spread on identical inputs. No single number is “the” cost; that is exactly why you estimate more than one way and reconcile.
How the spread is built: all five lenses estimate the same quantity — the total cost of this programme — so all five respond to the planning horizon. Per-system work does not stretch with the schedule, but standing programme costs (PMO, governance, discovery) accrue for as long as the programme runs, so those scale while the per-system term does not. The parametric lens remains the most horizon-sensitive by construction, since it is a share of annual budget spent every year. The cost-of-inaction marker is a different quantity and is deliberately kept off the migration-cost comparison.
Monte Carlo, run live
The probabilistic lens doesn't give a number — it gives a distribution. Run it and watch 1,000 draws build the shape. Each draw samples an uncertain average cost per system. The middle 80% lies between P10 and P90. Editing the scenario clears the animation.
The optional ROI Calculator explores how scoped costs, benefits and discounting affect a scenario. Review its assumptions and sensitivity alongside these ranges; agreement between estimates can reflect shared assumptions.
Cost Model Comparison — Export
Compare scenario outputs
Keep a baseline, change one assumption in the tool, then compare the generated report here. The comparison stays in this browser tab when session storage is available.
Export the comparison as markdown, PDF, or DOCX — also saved to your Command Center Risk Artifacts.
Illustrative simulation for building intuition. Figures derive from the sliders above and the labelled constants in each method — not from your organization's data.
- /assess — compliance frameworks step— Step 5 captures policy + framework registry
- /compliance — framework explorer
- /leaders — stakeholder ecosystem
- /library — policy & governance docs
- NIST CSWP.39-upd1 — Considerations for Achieving Crypto Agility (Dec 2025, upd. Jun 2026)
- NIST IR 8547 — Transition to PQC Standards
- ENISA — Post-Quantum Cryptography Integration Study
- NIST Computer Security Resource Center (Americas)
- NIST News & Events (Americas)
- NSA Media Defense Portal (Americas)
- CISA Quantum Page (Americas)
- BSI Post-Quantum Cryptography (EMEA)
- ANSSI Cryptography Guidelines (EMEA)
Try it
- 1. Predict before you run it.
- 2. Run or change the tool above.
- 3. Explain what the result shows.
Two migration-cost estimates are close, but both use the same inventory that omits several systems. What does their small spread establish?
Next step
Next in Risk & Strategy: CRQC Scenario PlannerCRQC Scenario Planner is the next Risk & Strategy tool in the Command Center.